Implemented projects

Construction of a 310 MW steam and gas turbine power plant

The project consists

of 4 gas turbine generators (50 MW) and 2 steam turbine generators (55 MW)

Source of funding:

Republican Budget

Commissioning date:

December 2019

Physical progress:

100%

Current status:

in operation

 

Construction of 2 lines of overhead line 220 for the needs of KEGOC JSC (41 km.)

The project consists

of 2 220 kV overhead lines with a length of 41 km

Source of funding:

Samruk-Kazyna loan

Commissioning date:

July 2019

Physical progress:

100%

Current status:

implemented in favor of KEGOC JSC

 

Construction of an on-site road (2.8 km.)

The project consists

of 2.8 km long highway

Source of funding:

Republican Budget

Commissioning date:

july 2019

Physical progress:

100%

Current status:

in operation

 

Installation of water treatment and wastewater treatment (1st stage)

The project consists

of installation of WT and wastewater treatment

Source of funding:

Republican Budget

Commissioning date:

December 2021

Physical progress:

100%

Current status:

ongoing commissioning work

 

External water supply - main water pipeline (31 km.)

The project consists

of 31 km long water pipeline 

Source of funding:

Republican Budget

Commissioning date:

April 2021

Physical progress:

100%

Current status:

in operation